Monday, August 17, 2009
Roof tiles, front door , bathtub and a fireplace.
Brian, Tim and Nick work on the roof.
Now we need a doorbell
There's a beautiful copper front that goes on the fireplace.
The bathtub isn't quite ready for water.
Frame Signing Aug. 8th
Friday, August 7, 2009
Aug. 7th The Cow Jumped Over the Moon!
When I got home from work tonight Nick shared some photos he took with his new camera. The moon was full and bright. He is so creative! It reminded me of a video I have of Sam reciting the nursery rhyme. What a sweet memory. We still have the video, thank God. Tomorrow is our frame signing. I thought the day would never come.
Tuesday, August 4, 2009
Waiting for roof tile.
I saw the Skylift arrive at about 7AM. Then nothing. The delivery truck loaded with roof tile broke an axel. It never arrived. We wait.
Subscribe to:
Posts (Atom)