Wednesday, October 7, 2009
Oct. 7th 9:00 PM After a long day at work.
No pictures because I'm not a happy camper. I got home from work to find the only nice thing in the garage, a new cabinet, did NOT get covered before the spray paint went on! AARRGHHH! OH well, thanks for letting me vent! I NEEDED THAT. As my friend Renee would say "Step away from the edge." OK, I'm drinking some wine and going to bed.
Monday, October 5, 2009
October 5th God's Blessings
Although there's a rainbow, it has not poured rain on us yet. We're not prepared for rain. This week the garage will be painted then the doors go on. Then it can rain.

This is my beautiful glass door that Dolores made. It is in Barry's family room for now.
The drywall is being textured this week then it will be ready for primer. The cabinets are being made and I'm still searching for the right tile. Wish me luck.
Tuesday, September 29, 2009
More Stucco and drywall.
Wednesday, September 23, 2009
Lots of Activity Sept. 23
The 34th annual Virgo Birthday Party took place on Sunday. Still going strong, haven't lost one yet!
The dry wall hangers were going great guns today. I have to stop making changes.
Richard prepared the vent enclosure. What a perfectionist. I love it.
John put together PVC fire hose bibs. I was gone all day choosing flooring and lighting.
Sunday, September 20, 2009
Fish and Fowl
Monday, September 14, 2009
September 14th, 2009 Insulation Installed
Sunday, September 6, 2009
September 6th 2009
It has been very hectic taking care of the details in building the house. Our crew is working painstakingly to keep things moving ahead.

Richard creates the bar from a photo I gave him.

Joe finishes the rough electrical. I promised no more changes until after the inspection.

The outside gets wrapped for stucco.
Richard creates the bar from a photo I gave him.
Joe finishes the rough electrical. I promised no more changes until after the inspection.
The outside gets wrapped for stucco.
Subscribe to:
Posts (Atom)